图纸之外的真实现场——项目的施工进度纪实,以及维立在材料与工艺上的实践笔记。这里不是效果图,是过程本身。What happens beyond the drawings — real progress from active sites, along with WEILI's notes on materials and technique. Not renderings — the process itself.
这里将记录赞比亚Lucas Hotel项目的现场施工进度——如放线定位、材料进场、结构封顶等关键节点,配合现场照片。Site progress for the Lucas Hotel Zambia project will be logged here — survey and layout, material delivery, structural topping-out, and other key milestones, with site photos.
宝莱酒店项目的现场落地过程,如有留存的施工阶段照片或资料,可以补充进这里。Delivery process for the BONNA Hotel project — construction-phase photos or documentation can be added here if available.
从造价、工期、气候适应性角度对比两种主流幕墙工法的适用场景。Comparing cost, schedule, and climate performance to guide the choice between the two dominant facade methods.
干挂石材的构造逻辑、常见失误与验收要点。The logic of dry-hang stone construction, common pitfalls, and what to check at handover.
模块化拆装设计如何降低海运损耗与现场安装难度。How modular, flat-pack design cuts shipping damage and simplifies on-site installation.